Client :
Dole
Asia Limited

|
Project
: AGRI-MRP (Agriculture Materials Requirements Planning System)
|
| Synopsis: |
|
Dole Asia Limited
contracted RADIX to analyze, design, develop and implement an
integrated Materials Requirements Planning System for their Agriculture
Division. The system enables Agriculture to have a fair estimate of the
required materials as well as the scheduling of activities needed to
meet the desired fruit tonnage output.
The system is composed of two main parts: Planning and
Actual Field Data Entry. The Planning is done using PCs while the Actual
field data are entered into the AS/400. The actual field data are used
by the planning side to make the projections.
The Planning side was programmed by DOLE and the
AS/400 Actual field data entry by RADIX. The AS/400 modules
consist of the following:
 |
Agricultural Planning and Control |
 |
Land Preparation and Planting |
 |
Field Maintenance |
 |
Harvesting |
 |
Fresh Fruits |
 |
Growers |
|
| Logistics: |
|
Hardware |
IBM AS/400 |
|
Software |
OS/400, ILE RPG/4, ILE
SQLRPG,
ILE CL/400 |
|
Duration |
7 months |
|
Size |
99 programs (235 ILE Modules),
4 Service Programs (7 Modules) |
|
Peak Manpower |
11 Analysts and Programmers |
| Contact Person: |
|
MR. JERRY CAMPECINO |
|
MIS Manager |
|
DOLE Philippines,
Inc. |
|
Polomolok, South
Cotabato 9707 |
[Back to Systems Development Main]
|
| |
|
Copyright © 2001-2007 Radix Systems Services Corporation. All rights reserved.
Address: Hino Bldg, EDSA cor. Madison St, Mandaluyong City, Philippines. Contact numbers: (63)(2) 634-7293 to 95 / (63)(2) 634-0084. E-mail address: contactus@radixsys.com
|